
11
7. Locate the extraction funnel (12). Loosen the clamping
rig bolt/nut to the base of the funnel, lower the wide end
of the funnel on top of the drum (7) and line up the rims.
Position the clamping ring over the rims and tighten the
bolt/nut to lock both units (7-12) together, see 16-17-18.
Fig 16-17-18
8. Locate the bin cover (10), 1/4 “ Hex bolts (g), 1/4" nuts
(a) and the supplied 10-12mm spanner (26). Place the
bin cover (10) face up, on top of the funnel assembly
(12). Line up the pre-drilled holes, place a Hex bolt (g)
down through one of the holes and lightly secure with
a 1/4"nut (a), see fi g 19-20-21. Repeat for the remaining
holes then fully tighten, see fi g 22.
12
Clamping ring
Rim
7
Fig 19
Fig 20-21-22
a
g
26
10
g
26
Continues Over....
Commenti su questo manuale