13
12. Locate the bin handle (20), button Phillips screws (f)
and domed head nuts (b). Line up the threaded holes in
the handle (20) with the two pre-drilled holes in the bin
(9) and secure in place with the 1/4" Phillips screw (f ) and
nuts (b), see fi g 31-32.
Fig 31-32
13. Turn the cyclone assembly upright on its wheels,
WARNING! THE MACHINE IS HEAVY
YOU ARE ADVISED TO SEEK HELP!
locate the fl exible hose (8) and the two large clips (24).
Place a clip over one end of the hose, introduce the hose
over the bins inlet manifold and tighten the clip, DON’T
OVERTIGHTEN otherwise the hose could split, see fi g
33. Place the remaining clip over the opposite end of
the hose, insert the hose over the outlet manifold on the
extraction drum (7) and tighten the clip, see fi g 34.
Fig 33-34
14. Locate the large dust bag (19), open the bag and
place it inside the bin (9), see fi g 35. (Make sure the bag
is tucked over the edge of the bin)
Fig 35
15. Position the bin (9) beneath the bin cover (10), line up
the bin lever latches (25) with the hooks on the bin cover
(10), hook on the latches and press down the lever
handles to raise the bin against the cover, making a tight
seal, see fi g 36-37.
Fig 36-37
Continues Over....
20
f
b
8
24
19
Commenti su questo manuale